If i run a baseline to upgrade tools and vmware hardware and then choose remediate, is update manager smart enough to do tools first and then do the upgrade of the vm hardware? I have some machines i have moved from 4.1 to 5.1 and both operations need to be done. I just don't know if i should do them both together or separately.
↧